Calendar Cove

Ramadan 2027 Timetable: Multan

Sehri (suhoor) and iftar times for every day of Ramadan 2027 in Multan, Pakistan. Ramadan is expected to begin on Monday, 8 February 2027 (or a day later) and end with Eid ul-Fitr on about Tuesday 9 March.

First sehri ends05:39 on Mon 8 Feb
First iftar17:57 on Mon 8 Feb
Longest fast13h 04m on 8 Mar

Download PDF

DateDaySehri endsIftarFast
Mon 8 Feb105:3917:5712h 18m
Tue 9 Feb205:3817:5712h 19m
Wed 10 Feb305:3817:5812h 20m
Thu 11 Feb405:3717:5912h 22m
Fri 12 Feb505:3618:0012h 24m
Sat 13 Feb605:3618:0112h 25m
Sun 14 Feb705:3518:0112h 26m
Mon 15 Feb805:3418:0212h 28m
Tue 16 Feb905:3318:0312h 30m
Wed 17 Feb1005:3218:0412h 32m
Thu 18 Feb1105:3218:0512h 33m
Fri 19 Feb1205:3118:0512h 34m
Sat 20 Feb1305:3018:0612h 36m
Sun 21 Feb1405:2918:0712h 38m
Mon 22 Feb1505:2818:0812h 40m
Tue 23 Feb1605:2718:0812h 41m
Wed 24 Feb1705:2618:0912h 43m
Thu 25 Feb1805:2518:1012h 45m
Fri 26 Feb1905:2418:1112h 47m
Sat 27 Feb2005:2318:1112h 48m
Sun 28 Feb2105:2218:1212h 50m
Mon 1 Mar2205:2118:1312h 52m
Tue 2 Mar2305:2018:1312h 53m
Wed 3 Mar2405:1918:1412h 55m
Thu 4 Mar2505:1818:1512h 57m
Fri 5 Mar2605:1718:1512h 58m
Sat 6 Mar2705:1618:1613h 00m
Sun 7 Mar2805:1518:1713h 02m
Mon 8 Mar2905:1318:1713h 04m
Tue 9 MarEid (expected), or still Ramadan if it started a day later05:1218:1813h 06m

Times for Multan (30.16, 71.47), local time, calculated with the University of Islamic Sciences, Karachi method: Fajr at 18°, Maghrib at sunset. Sehri ends at Fajr; many mosques advise stopping about 10 minutes earlier. Ramadan dates follow the Umm al-Qura calendar and are expected until the moon is sighted. If Ramadan starts a day later where you are, use the same row for each date: the times depend on the date, not the Ramadan day.

Other cities in Pakistan

Karachi · Lahore · Islamabad · Faisalabad · Rawalpindi · Peshawar

All Ramadan 2027 timetables · Ramadan 2027 dates by country · Eid ul-Fitr 2027

Questions

When does Ramadan 2027 start in Multan?

The first fast is expected on Monday, 8 February 2027 or Tuesday 9 February. In Pakistan, Ramadan starts announced by the Ruet-e-Hilal Committee, often one day after Saudi Arabia. The date is confirmed after the new moon is sighted on the evening before.

What time is sehri and iftar in Multan on the first day?

On Monday 8 February, sehri ends at 05:39 (Fajr) and iftar is at 17:57 (Maghrib), a fast of 12h 18m.

How long are the fasts in Multan?

From 12h 18m on 8 February to 13h 04m on 8 March. Fasts get longer through the month as the days lengthen.

Why are these times different from my mosque's timetable?

Mosques use different calculation methods and add a few minutes of caution. This timetable uses the University of Islamic Sciences, Karachi method (Fajr at 18°, Maghrib at sunset). Many mosques advise stopping eating about 10 minutes before the sehri time (imsak). If your mosque publishes a timetable, follow it.